Project Description:
Mine tailings drainage, the depth of the pit is 2 meters, the diving depth of the pump is required to be no less than 1.8 meters. Breaking the conventional extension pipe design, the pump shaft is required to be 1.8 meters long, stable operation, reliable performance, durable, anti-wear, and a complete set of motors.
Pump selection: 40PV-ZP vertical sump slurry pump
Pump capacity: 25m3/h
Pump head: 15m
Submerged length: 1800mm